Friday, September 30, 2011

Subfloor


The subfloor is installed. We have a little bit of framing in the lower level to finish and then the main level framing begins

Wednesday, September 28, 2011

Framing


Interior walls are being framed in the lower level

Tuesday, September 27, 2011

Basement framing

The rain has subsided and the basement framing has begun. The outside walls are up and the interior walls are on there way.

Wednesday, September 21, 2011

Construction begins


The sill plates start going down, but rain is looming all week. It is going to be a slow start.