Friday, October 28, 2011

A Rainy days progress






















The footing for the deck columns are poured and the entry porch concrete is finished

Thursday, October 27, 2011

Concrete Porch and Deck Footings


The Footings are dug for the deck and porch off of the rear of the house.











The First stage of prep for the front Porch











The Zip flashing is installed around all of the seems










The Final stage of Weathersheild is applied
The seems are taped and the fabric is ready
for the final prep work to be completed by
Mosseller Concrete.

Tuesday, October 25, 2011

The Jobsite remains spic and span


Our senior construction analyst demonstrates how to properly remove debris from the floor.

Shaping up



The roof sheathing has been applied to the center section of the house























The overhangs are being framed and the construction of the endwall sheathing has begun

Thursday, October 20, 2011

The Trusses are Set

 
 



Finally, it was a clear, cool (sometimes breezy) Autumn day, the crane was available, and the trusses were set by 1.00 PM.  btw - there is a triangular cap that goes on top of each truss, the roof will really NOT be flat on the top.

Tuesday, October 18, 2011

Zip Wall

























The walls are sheeted with zip wall. We are ready to set trusses. but yet again it is supposed to rain again. If it doesnt rain tomorrow then we will set the trusses.Otherwise we will set the trusses on Thursday morning.

Sunday, October 9, 2011

Shaping Up

Standing in the Family Room
The front of the house
Ruthie and I met her brother Larry and his wife Georgia (from Asheville) at Lake Lure on Saturday.  It was a beautiful day, we had lunch and checked out the progress of the house.   It is beginning to feel like a house now because you can actually walk from one room to another.

Wednesday, October 5, 2011

Framing


The main level framing has begun.