Friday, March 23, 2012

Spring Brings Color

We have had an early, warm and dry Spring so exterior painting of the siding is complete.   What a difference this makes.  Roger has finished the rear retaining wall (Jonathan has to add the stairs from the deck to the wall).  Roger is hauling additional stone next week for another retaining wall in the front, and for the accent stone work on the front porch walls. On the inside, the hardwood floors are down (but covered), the interior walls, doors and trim are installed and painted.  The tile floors will be installed next, then the cabinets will be delivered.   On the outside, the septic tank and the LP gas tank are both buried and the well is complete.   And the "landscape lady" will meet with Ruthie and I on Easter Saturday morning.

 


We intend to have the C.O. by April 20, and then to close by the end of the month.  Ruthie and I are getting excited.