At least we have a well. 305 ft deep, 10+ gal/min. The pump will be lowered Saturday - but the actual connections to the house will probably not be made until the final inspections are scheduled.
The house has passed the rough-in plumbing, electrical, gas and the insulation inspections. Drywall installation started today.
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.