Thursday, February 2, 2012

We Have Water, sorta

At least we have a well.  305 ft deep, 10+ gal/min.  The pump will be lowered Saturday - but the actual connections to the house will probably not be made until the final inspections are scheduled. 

The house has passed the rough-in plumbing, electrical, gas and the insulation inspections.  Drywall installation started today.

Roger has started the final site grading, and he has selected the stone for the retaining walls.